Case Studies

Brynderwyns road improvements

Written by Prime Fluid Management | Jul 29, 2024 11:02:16 PM

Fulton Hogan, in collaboration with NZ Transport Agency Waka Kotahi, led the SH1 Brynderwyn Hill Recovery Works to improve the roads and address environmental concerns. This extensive project involved a 2km rebuild of the Brynderwyns on SH1 in Northland. The remediation, carried out over a four-month road closure and successfully addressed 18 slips caused by Cyclone Gabrielle.

Project: The SH1 Brynderwyn Hill Recovery Work

Customer:
Fulton Hogan

Challenge:
Large areas of exposed soil posed a significant risk of contaminated run-off water entering nearby streams.
Finding a solution to prevent sediment from entering the waterway, which could contaminate the water and impact aquatic life.



Solution:
Envirohubs were set up to capture run-off water. These systems automatically activate and dose according to pre-determined bench test parameters.

Result:
Sediment was effectively prevented from entering the waterways.


Lamella Clarifier. 

*Formerly known as Prime Pump, now Prime Fluid Management