Insights from the SH1 Brynderwyn Hill Recovery Works: A Forum Recap
The SH1 Brynderwyn Hill Recovery Works, led by Fulton Hogan, provided a wealth of learning opportunities at the Erosion and Sediment Control Practitioners Forum in Auckland in June.
Resilient Spaces and Environmental Protection
Ella Harford, Environmental Advisor at Fulton Hogan, shared her team’s innovative approach to creating resilient spaces necessary for initiating repair work while securing the fragile surroundings for the future. Her insights underscored the importance of strategic planning and environmental stewardship in large-scale infrastructure projects.
Prime Pump's Role in Ensuring Safe Water Discharge
Prime Pump Hire Manager, George Everest, joined Ella on stage to highlight the critical role our Envirohub incline plate settling tanks (lamella clarifiers) played in the project. These advanced systems were essential in treating rainwater runoff, ensuring it was safe before being discharged into the area's sensitive waterways.
Envirohub Lamella Clarifier
Envirohub Lamella Clarifiers, adapted for New Zealand conditions, are ideal for remote sites with no power and sensitive waterways. Designed by Envirohub, these compact, 100% solar-powered systems feature proportional dosing and an integrated oil and water separator.