Latest News and Updates | Prime Pump

Insights from the SH1 Brynderwyn Hill Recovery Works

Written by Prime Fluid Management | 29 August 2024

The SH1 Brynderwyn Hill recovery works, led by Fulton Hogan, provided a wealth of learning opportunities at the Erosion and Sediment Control Practitioners Forum in Auckland.

Resilient spaces and environmental protection

Ella Harford, Environmental Advisor at Fulton Hogan, shared her team’s innovative approach to creating resilient spaces necessary for initiating repair work while securing the fragile surroundings for the future. Her insights underscored the importance of strategic planning and environmental stewardship in large-scale infrastructure projects.

Prime's role in ensuring safe water discharge

Hire Manager, George Everest, joined Ella on stage to highlight the critical role our EnviroHub Lamella Clarifier incline plate settling tanks played in the project. These advanced systems were essential in treating rainwater runoff – ensuring it was safe before being discharged into the area's sensitive waterways.

Envirohub Lamella Clarifier

Envirohub Lamella Clarifiers, adapted for New Zealand conditions, are ideal for remote sites with no power and sensitive waterways. Designed by Envirohub, these compact, 100% solar power-capable systems feature proportional dosing and an integrated oil and water separator.

 

Need Help Planning a Water Treatment Setup?

Talk to our team about your treatment, dosing and site requirements.