Skip to content
Brynderwyn-hills-lamella-resize_1200x900
2 min read

Insights from the SH1 Brynderwyn Hill Recovery Works

Insights from the SH1 Brynderwyn Hill Recovery Works: A Forum Recap

The SH1 Brynderwyn Hill Recovery Works, led by Fulton Hogan, provided a wealth of learning opportunities at the Erosion and Sediment Control Practitioners Forum in Auckland in June.  

Resilient Spaces and Environmental Protection 

Ella Harford, Environmental Advisor at Fulton Hogan, shared her team’s innovative approach to creating resilient spaces necessary for initiating repair work while securing the fragile surroundings for the future. Her insights underscored the importance of strategic planning and environmental stewardship in large-scale infrastructure projects. 

Prime Pump's Role in Ensuring Safe Water Discharge 

Prime Pump Hire Manager, George Everest, joined Ella on stage to highlight the critical role our Envirohub incline plate settling tanks (lamella clarifiers) played in the project. These advanced systems were essential in treating rainwater runoff, ensuring it was safe before being discharged into the area's sensitive waterways. 

Envirohub Lamella Clarifier

Envirohub Lamella Clarifiers, adapted for New Zealand conditions, are ideal for remote sites with no power and sensitive waterways. Designed by Envirohub, these compact, 100% solar-powered systems feature proportional dosing and an integrated oil and water separator.

*Formerly known as Prime Pump, now Prime Fluid Management.  

RELATED ARTICLES