Skip to content

Prime Fluid Management

avatar

Blog Post by Prime Fluid Management

2 min read

Getting to the Cause of Repeat Pump Failure

At Ravensdown’s Hornby Works, a vertical spindle pump kept losing prime and demanding ...
Start Reading
2 min read

Reducing Repeat Blockages at Pump Station 66

Weekly pump blockages had become routine at wastewater Pump Station 66 – sometimes ...
Start Reading
3 min read

Removing Dissolved Heavy Metals from Pond Water

At first, it looked like a pond dewatering job. A storage pond in Whangārei was holding ...
Start Reading
2 min read

Keeping Live Sewer Flow Moving

A critical sewer doesn’t stop because repair work starts. When relining works are staged ...
Start Reading
2 min read

Delivering a Complex Water Take Project at Scale

Water take is one thing. Delivering it at scale across multiple sites along a 24km route ...
Start Reading
2 min read

Stockton Mine Case Study

Stockton Mine, New Zealand’s largest opencast operation, sits in one of the country’s ...
Start Reading
2 min read

McIntosh Drain, Kaiapoi

The McIntosh Drain in North East Kaiapoi, a modified natural water catchment area serving ...
Start Reading
1 min read

Cyclone Gabrielle Response in Hawke’s Bay

On February 13th 2023, Cyclone Gabrielle struck the Hawke’s Bay region, causing ...
Start Reading
1 min read

Overpumping the Maitai River

Gravel deposits swept into Nelson City’s largest river after flooding in August 2022, ...
Start Reading
< 1 min read

Brynderwyns Road Improvements

Fulton Hogan, in collaboration with NZ Transport Agency Waka Kotahi, led the SH1 ...
Start Reading